Rte |
County |
Date
From |
Date
To |
Time
In |
Time
Out |
Dir |
Location /
Additional Information |
Estimated
Delay |
4 |
SJ |
05/22/18 |
05/23/18 |
8:30 |
16:30 |
EB |
Begin: Argonaut Street
End: Argonaut Street
Restriction: Right shoulder
Reason: Utility Work |
None |
4 |
SJ |
05/21/18 |
05/24/18 |
6:01 |
17:01 |
EB/WB |
Begin: Garfield Street Overhead (East of Fresno Avenue)
End: Lincoln Street
Restriction: #2 of 2 lanes
Reason: Bridge Work |
5 mins |
4 |
SJ |
05/21/18 |
05/24/18 |
6:01 |
17:01 |
WB |
Begin: Lincoln Street
End: Lincoln Street
Restriction: Full off and on-ramp closures
Reason: Bridge Work |
5 mins |
4 |
SJ |
05/21/18 |
05/24/18 |
6:01 |
18:01 |
EB/WB |
Begin: Adelbert Avenue
End: Walker Lane
Restriction: Moving closure - #1 of 2 lanes
Reason: Striping Operation |
10 mins |
4 |
SJ |
05/21/18 |
05/24/18 |
6:01 |
18:01 |
EB/WB |
Begin: Walker Lane
End: Van Allen Drive
Restriction: One-way traffic control
Reason: Striping Operation |
10 mins |
4 |
SJ |
05/25/18 |
05/25/18 |
6:01 |
13:01 |
EB/WB |
Begin: Walker Lane
End: Van Allen Drive (Right)
Restriction: One-way traffic control
Reason: Striping Operation |
10 mins |
5 |
SJ |
05/20/18 |
05/23/18 |
20:01 |
5:01 |
NB |
Begin: Stanislaus/San Joaquin County Line
End: 11th Street
Restriction: Moving closure - #1, #2 of 2 lanes, left shoulder
Reason: Striping Operation |
10 mins |
5 |
SJ |
05/22/18 |
05/25/18 |
19:01 |
7:01 |
NB |
Begin: 1th Street
End: Lathrop Road
Restriction: Moving closure - #1, #2 of 5 lanes, left shoulder
Reason: Striping Operation |
10 mins |
5 |
SJ |
05/23/18 |
05/25/18 |
20:01 |
6:01 |
SB |
Begin: Lathrop Road
End: Stanislaus/San Joaquin County Line
Restriction: Moving closure - #1, #2 of 4 lanes, left shoulder
Reason: Striping Operation |
10 mins |
5 |
SJ |
05/21/18 |
05/23/18 |
20:01 |
5:01 |
NB |
Begin: Pixley Slough
End: Eight Mile Road
Restriction: #3 of 3 lanes
Reason: Crack Seal Operation |
10 mins |
5 |
SJ |
05/22/18 |
05/25/18 |
9:01 |
15:01 |
N/A |
Begin: Eight Mile Road
End: Eight Mile Road
Restriction: Right turn lane (local street)
Reason: Utility Work |
1 mins |
5 |
SJ |
05/23/18 |
05/24/18 |
20:01 |
5:01 |
SB |
Begin: Thornton Road
End: Eight Mile Road
Restriction: #3 of 3 lanes
Reason: Crack Seal Operation |
15 mins |
5 |
SJ |
05/22/18 |
05/24/18 |
20:01 |
5:01 |
SB |
Begin: State Route 12
End: Thornton Road
Restriction: #3 of 3 lanes
Reason: Crack Seal Operation |
15 mins |
5 |
SJ |
05/20/18 |
05/21/18 |
20:01 |
5:01 |
NB |
Begin: Turner Road
End: Turner Road
Restriction: #2 of 2 lanes
Reason: Crack Seal Operation |
15 mins |
5 |
SJ |
05/20/18 |
05/21/18 |
20:01 |
5:01 |
NB |
Begin: Beaver Slough
End: Walnut Grove
Restriction: #2 of 2 lanes
Reason: Crack Seal Operation |
15 mins |
5 |
SJ |
05/21/18 |
05/22/18 |
20:01 |
5:01 |
NB |
Begin: Mokelumne River
End: San Joaquin/Sacramento County Line
Restriction: #2 of 2 lanes
Reason: Crack Seal Operation |
15 mins |
5 |
STA |
05/14/18 |
05/18/18 |
20:01 |
6:01 |
NB/SB |
Begin: Merced/Stanislaus County Line
End: Stanislaus/San Joaquin County Line
Restriction: Moving closure
Reason: Striping Operation |
10 mins |
5 |
STA |
05/14/18 |
05/18/18 |
20:01 |
6:01 |
SB |
Begin: Merced/Stanislaus County Line
End: Wesley Rest Area
Restriction: Various off and on-ramp closures
Reason: Striping Operation |
20 mins |
12 |
SJ |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
EB |
Begin: SB State Route 99
End: SB State Route 99
Restriction: Full off-ramp closure
Reason: Striping Operation |
5 mins |
12 |
SJ |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
EB/WB |
Begin: NB State Route 99
End: NB State Route 99
Restriction: Full off-ramp closure
Reason: Striping Operation |
5 mins |
26 |
SJ |
05/22/18 |
05/22/18 |
9:01 |
15:01 |
EB/WB |
Begin: Duncan Road
End: Bonham Street
Restriction: One-way traffic control
Reason: Tree Work |
10 mins |
33 |
MER |
05/25/18 |
05/25/18 |
7:01 |
15:01 |
NB/SB |
Begin: Plaza Road
End: SB State Route 140
Restriction: Moving closure
Reason: Shoulder Work |
5 mins |
49 |
AMA |
05/21/18 |
05/22/18 |
6:01 |
18:01 |
NB/SB |
Begin: Airport Road
End: Valley View Ridge Drive
Restriction: #1, #2 of 2 lanes (alternating)
Reason: Drainage Cleaning/Inspection |
10 mins |
49 |
CAL |
04/30/18 |
05/25/18 |
0:01 |
23:59 |
SB |
Begin: Stanislaus Avenue
End: Murphys Grade Road
Restriction: Long-term #1 of 3 lanes, left shoulder
Reason: Shoulder Work |
1 mins |
49 |
CAL |
05/22/18 |
05/22/18 |
7:01 |
18:01 |
NB/SB |
Begin: Clifton Lane
End: Cherokee Creek
Restriction: #1 of 3 lanes, right shoulder
Reason: Utility Work |
2 mins |
49 |
CAL |
05/21/18 |
05/24/18 |
9:01 |
15:30 |
NB/SB |
Begin: State Route 26/Mokelumne Hill
End: State Route 12
Restriction: One-way traffic control
Reason: Shoulder Work |
10 mins |
49 |
TUO
MPA |
03/22/18 |
06/01/18 |
0:01 |
23:59 |
NB/SB |
Begin: SB State Route 120
End: Bear Valley Road
Restriction: Long-term full highway closure
Reason: Roadway wash-out/slip-out |
60 mins |
49 |
TUO |
05/22/18 |
05/23/18 |
7:01 |
16:30 |
NB/SB |
Begin: Fifth Avenue
End: Fifth Avenue
Restriction: Left shoulder, right shoulder
Reason: Utility Work |
1 mins |
59 |
MER |
05/21/18 |
05/22/18 |
9:01 |
16:01 |
NB/SB |
Begin: West Olive Avenue
End: La Grange Road
Restriction: Moving closure
Reason: Striping Operation |
10 mins |
88 |
ALP |
05/22/18 |
05/24/18 |
8:30 |
16:01 |
EB/WB |
Begin: Amador/Alpine County Line
End: California/Nevada State Line
Restriction: Moving closure - #1 of 2 lanes
Reason: Striping Operation |
10 mins |
88 |
AMA |
05/23/18 |
05/23/18 |
8:01 |
14:01 |
WB |
Begin: Ridge Road
End: Berry Street
Restriction: #1 of 3 lanes, left shoulder
Reason: Utility Work |
1 min |
88 |
AMA |
05/21/18 |
05/21/18 |
9:30 |
16:01 |
EB/WB |
Begin: State Route 26
End: Amador/Alpine County Line
Restriction: Moving closure
Reason: Striping Operation |
10 mins |
88 |
AMA |
05/21/18 |
05/25/18 |
6:01 |
20:01 |
EB/WB |
Begin: Peddler Hill Road
End: Tragedy Springs Road
Restriction: One-way traffic control
Reason: Grinding Operation |
15 mins |
88 |
AMA |
05/21/18 |
05/25/18 |
7:01 |
20:01 |
EB/WB |
Begin: Silver Lake Campground
End: Amador/Alpine County Line
Restriction: One-way traffic control
Reason: Grinding Operation |
15 mins |
99 |
MER |
05/20/18 |
05/23/18 |
19:01 |
5:59 |
SB |
Begin: Webber Canal
End: Owens Creek
Restriction: #2 of 2 lanes
Reason: Striping Operation |
10 mins |
99 |
MER |
05/20/18 |
05/25/18 |
19:01 |
5:59 |
NB/SB |
Begin: Mission Avenue
End: 16th Street Undercrossing
Restriction: Various full off/on ramp closure
Reason: Striping Operation |
10 mins |
99 |
MER |
05/22/18 |
05/22/18 |
8:01 |
15:01 |
NB |
Begin: Childs Avenue
End: Childs Avenue
Restriction: Full-off ramp closure
Reason: Landscape/Irrigation Work |
10 mins |
99 |
MER |
05/20/18 |
05/25/18 |
19:01 |
6:01 |
NB/SB |
Begin: EB State Route 140
End: El Capitan
Restriction: #1 of 2 lanes (various locations )
Reason: Bridge Work |
10 mins |
99 |
MER |
05/20/18 |
05/25/18 |
19:01 |
5:01 |
NB/SB |
Begin: EB State Route 140
End: Golden State Boulevard
Restriction: Various full off and on-ramp closures
Reason: Bridge Work |
10 mins |
99 |
MER |
05/22/18 |
05/22/18 |
8:01 |
15:01 |
NB |
Begin: Franklin Road
End: Franklin Road
Restriction: Full off-ramp closure
Reason: Landscape/Irrigation Work |
10 mins |
99 |
MER |
05/22/18 |
05/22/18 |
8:01 |
15:01 |
NB |
Begin: Applegate Road
End: Applegate Road
Restriction: Full off-ramp closure
Reason: Landscape/Irrigation Work |
10 mins |
99 |
MER |
05/20/18 |
05/25/18 |
20:01 |
7:01 |
N/A |
Begin: South Avenue
End: South Avenue
Restriction: One-way traffic control (local street)
Reason: Bridge Work |
10 mins |
99 |
MER |
05/20/18 |
05/25/18 |
22:01 |
7:01 |
N/A |
Begin: Bradbury Road
End: Bradbury Road
Restriction: One-way traffic control (local street)
Reason: Bridge Work |
10 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
20:01 |
5:01 |
NB |
Begin: Milgeo Avenue
End: Milgeo Avenue
Restriction: Full on-ramp closure
Reason: Highway Construction |
5 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
20:01 |
5:01 |
NB |
Begin: Jacktone Road
End: Austin Road
Restriction: #3 of 3 lanes, right shoulder
Reason: Highway Construction |
5 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
20:01 |
5:01 |
NB/SB |
Begin: Hammer Lane
End: State Route 4
Restriction: Various full off and on-ramp closures
Reason: Pavement Repair |
10 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
20:01 |
5:01 |
NB/SB |
Begin: Hammer Lane
End: Marsh Street Pedestrian Overcrossing (South of Srtate Route 4)
Restriction: #1, #2 of 3 lanes
Reason: Pavement Repair |
10 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
NB/SB |
Begin: Hammer Lane
End: Cherokee Lane
Restriction: Various full off and on-ramp closures
Reason: Striping Operation |
5 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
20:01 |
6:01 |
NB/SB |
Begin: Hammer Lane
End: South Lodi Overcrossing (South of Kettleman Lane)
Restriction: #1, #3, #2 of 3 lanes (alternating)
Reason: Striping Operation |
10 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
NB |
Begin: South Lodi Overcrossing (South of Kettleman Lane)
End: Woodbridge Road
Restriction: Various full off and on-ramp closures
Reason: Striping Operation |
5 mins |
99 |
SJ |
05/20/18 |
05/25/18 |
20:01 |
6:01 |
NB |
Begin: South Lodi Overcrossing (South of Kettleman Lane)
End: San Joaquin/Sacramento County Line
Restriction: #1, #2 of 2 lanes, auxiliary lane
Reason: Striping Operation |
10 mins |
99 |
STA |
05/21/18 |
05/25/18 |
8:01 |
15:01 |
NB |
Begin: Main Street
End: Main Street
Restriction: Partial off and on-ramp closure (right & eft shoulders)
Reason: Tree Work |
5 mins |
99 |
STA |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
N/A |
Begin: Carpenter Road/Briggsmore Avenue
End: Carpenter Road/Briggsmore Avenue
Restriction: #1, #3 of 4 lanes, median, right shoulder, left turn lane, bike lane (local street)
Reason: Highway Construction |
10 mins |
99 |
STA |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
SB |
Begin: Carpenter Road/Briggsmore Avenue
End: Carpenter Road/Briggsmore Avenue
Restriction: Full off and on-ramp closures
Reason: Highway Construction |
5 mins |
99 |
STA |
05/20/18 |
05/25/18 |
21:01 |
6:01 |
SB |
Begin: Beckwith Road
End: West Modesto Overhead (South of Briggsmore Avenue)
Restriction: #3, #2 of 3 lanes, right shoulder, auxiliary lane
Reason: Highway Construction |
10 mins |
99 |
STA |
05/20/18 |
05/25/18 |
20:01 |
5:01 |
NB |
Begin: Beckwith Road
End: Pelandale Avenue
Restriction: #3 of 3 lanes, right shoulder
Reason: Highway Construction |
5 mins |
99 |
STA |
05/20/18 |
05/25/18 |
20:01 |
5:01 |
NB/SB |
Begin: Hammett Road
End: Hammett Road
Restriction: Full on-ramp closure
Reason: Highway Construction |
5 mins |
108 |
STA |
05/21/18 |
05/21/18 |
9:01 |
15:01 |
EB |
Begin: Helen Avenue
End: Drake Avenue
Restriction: #2 of 2 lanes, right shoulder
Reason: Utility Work |
5 mins |
108 |
TUO |
05/20/18 |
05/25/18 |
20:01 |
5:59 |
EB/WB |
Begin: State Route 120/Yosemite Junction
End:WB State Route 49
Restriction: One-way traffic control
Reason: Pavement Repair |
10 mins |
108 |
TUO |
05/21/18 |
05/25/18 |
8:01 |
15:30 |
EB/WB |
Begin: Pigeon Flat Rest Area
End: Kennedy Meadows Road
Restriction: One-way traffic control
Reason: Shoulder Work |
10 mins |
120 |
SJ |
05/07/18 |
06/22/18 |
0:01 |
23:59 |
EB |
Begin: McHenry Avenue End: McHenry Avenue
Restriction: Long-term right shoulder, right turn lane
Reason: Roadway Excavation |
None |
120 |
STA |
05/18/18 |
05/20/18 |
5:30 |
21:01 |
WB |
Begin: State Route 108
End: State Route 108
Restriction: Long-term left turn lane
Reason: Special Event |
5 mins |
120 |
STA |
05/18/18 |
05/20/18 |
17:01 |
21:01 |
EB |
Begin: State Route 108
End: State Route 108 Restriction: Long-term #3 of 3 lanes
Reason: Special Event |
5 mins |
120 |
STA |
05/20/18 |
05/25/18 |
20:01 |
5:59 |
EB/WB |
Begin: Lancaster Road
End: Stanislaus/Tuolumne County Line
Restriction: One-way traffic control
Reason: Pavement Work |
10 mins |
120 |
TUO |
05/20/18 |
05/18/18 |
20:01 |
5:59 |
EB/WB |
Begin: Stanislaus/Tuolumne County Line
End: End Divided Highway
Restriction: #2 of 2 lanes, right shoulder
Reason: Pavement Work |
10 mins |
120 |
TUO |
05/21/18 |
05/18/18 |
6:30 |
15:30 |
EB/WB |
Begin: Stanislaus/Tuolumne County Line
End: End Divided Highway
Restriction: #2 of 2 lanes, right shoulder
Reason: Pavement Work |
10 mins |
120 |
TUO |
05/20/18 |
05/18/18 |
20:01 |
5:59 |
EB/WB |
Begin: End Divided Highway
End: NB State Route 49
Restriction: One-way traffic control
Reason: Pavement Work |
10 mins |
120 |
TUO |
05/20/18 |
05/18/18 |
18:01 |
6:01 |
EB/WB |
Begin: NB State Route 49
End: Moccasin Creek Bridge
Restriction: One-way traffic control
Reason: Pavement Work |
10 mins |
120 |
TUO |
05/21/18 |
05/18/18 |
6:30 |
15:30 |
EB/WB |
Begin: NB State Route 49
End: Moccasin Creek Bridge
Restriction: One-way traffic control
Reason: Pavement Work |
10 mins |
120 |
TUO |
05/21/18 |
05/24/18 |
7:01 |
16:01 |
EB/WB |
Begin: Tuolumne River Bridge
End: Tuolumne River Bridge
Restriction: One-way traffic control
Reason: Bridge Work |
10 mins |
132 |
SJ |
05/03/18 |
06/25/18 |
0:01 |
23:01 |
EB/WB |
Begin: Chrisman Road
End: Koster Road
Restriction: Long-term #1 of 2 lanes
Reason: Highway Construction |
5 mins |
132 |
STA |
05/21/18 |
05/25/18 |
8:30 |
15:01 |
EB/WB |
Begin: Rosemore Avenue
End: State Route 99
Restriction: One-way traffic control
Reason: Grinding and Paving |
10 mins |
140 |
MPA |
05/26/18 |
05/26/18 |
6:01 |
17:01 |
EB |
Begin: South Incline Road
End: Yosemite National Park Boundary
Restriction: Intermittent one-way traffic control
Reason: Special Event |
10 mins |
140 |
MPA |
05/21/18 |
05/24/18 |
7:01 |
16:01 |
EB/WB |
Begin: Crane Creek
End: South Incline Road
Restriction: One-way traffic control
Reason: Guardrail Work |
10 mins |
140 |
MPA |
05/25/18 |
05/25/18 |
7:01 |
13:01 |
EB/WB |
Begin: Crane Creek
End: South Incline Road
Restriction: One-way traffic control
Reason: Guardrail Work |
10 mins |
140 |
MER |
05/21/18 |
05/25/18 |
7:01 |
16:01 |
EB |
Begin: East Side Irrigation Canal (East of Van Clief Road)
End: East Side Irrigation Canal (East of Van Clief Road)
Restriction: One-way traffic control
Reason: Shoulder Work |
10 mins |
140 |
MER |
05/20/18 |
05/25/18 |
22:01 |
6:01 |
EB/WB |
Begin: East Side Irrigation Canal (East of Van Clief Road)
End: East Side Irrigation Canal (East of Van Clief Road)
Restriction: Full highway closure
Reason: Shoulder Work |
15 mins |
165 |
MER |
05/21/18 |
05/25/18 |
7:01 |
15:01 |
NB/SB |
Begin: Henry Miller Avenue
End: State Route 140
Restriction: Moving closure
Reason: Shoulder Work |
5 mins |
165 |
MER
STA |
05/22/18 |
05/24/18 |
9:01 |
16:01 |
NB/SB |
Begin: State Route 140
End: State Route 99
Restriction: Moving closure
Reason: Striping Operation |
5 mins |
580 |
ALA |
05/20/18 |
05/26/18 |
20:01 |
12:01 |
EB |
Begin: Midway Road
End: Greenville Road
Restriction: #1, #2, #3 of 4 lanes
Reason: Pavement Works |
10 mins |
580 |
ALA |
05/20/18 |
05/26/18 |
20:01 |
4:01 |
WB |
Begin: Midway Road
End: Greenville Road
Restriction: #1, #2, #3 of 4 lanes
Reason: Pavement Works |
10 mins |